Well Pump Claim Case Study

Not determining cause of loss and scope of damage on failed equipment may lead to settling for unnecessary replacements.
In the claim discussed in this case study, a policyholder reported that their failed well pump was damaged by lightning. The adjuster needed verification before settling the claim and engaged the StrikeCheck team for a quick, accurate response.
Fill out the form to find out how a StrikeCheck assessment met the carrier’s challenges and provided the adjuster with the information needed to determine best next steps.
Don’t miss insurance-focused resources and webinars about property, perils, and trends impacting claims nationwide by signing up for The Savvy Adjuster Newsletter.
Be sure to also tune in to The Savvy Adjuster Podcast to hear more from the experts themselves.
Alpine Intel’s content is meant to inform and educate readers using general terms and descriptions. They do not replace expert evaluations that determine facts and details related to each unique claim.
Request Your Case Study
Related Resources
Pool Claim Case Study
This case study involving a claim about a pool heater and a hurricane illustrates how StrikeCheck thoroughly looks at the facts to find the true cause of loss.